6 - Software Configuration Management - 1 - Management of the SCM Process


SCM controls the evolution and integrity of a product by identifying its elements; managing and controlling change; and verifying, recording, and reporting on configuration information. From the software engineer’s perspective, SCM facilitates development and change implementation activities. A successful SCM implementation requires careful planning and management. This, in turn, requires an understanding of the organizational context for, and the constraints placed on, the design and implementation of the SCM process.
Organizational Context for SCM
To plan an SCM process for a project, it is necessary to understand the organizational context and the relationships among organizational elements. SCM interacts with several other activities or organizational elements.
 The organizational elements responsible for the software engineering supporting processes may be structured in various ways. Although the responsibility for performing certain SCM tasks might be assigned to other parts of the organization (such as the development organization), the overall responsibility for SCM often rests with a distinct organizational element or designated individual.
Software is frequently developed as part of a larger system containing hardware and firmware elements. In this case, SCM activities take place in parallel with hardware and firmware CM activities and must be consistent with system-level CM. Note that firmware contains hardware and software; therefore, both hardware and software CM concepts are applicable.
SCM might interface with an organization’s quality assurance activity on issues such as records management and nonconforming items. Regarding the former, some items under SCM control might also be project records subject to provisions of the organization’s quality assurance program. Managing nonconforming items is usually the responsibility of the quality assurance activity; however, SCM might assist with tracking and reporting on software configuration items falling into this category.
Perhaps the closest relationship is with the software development and maintenance organizations. It is within this context that many of the software configuration control tasks are conducted. Frequently, the same tools support development, maintenance, and SCM purposes.
Constraints and Guidance for the SCM Process
Constraints affecting, and guidance for, the SCM process come from a number of sources. Policies and procedures set forth at corporate or other organizational levels might influence or prescribe the design and implementation of the SCM process for a given project. In addition, the contract between the acquirer and the supplier might contain provisions affecting the SCM process. For example, certain configuration audits might be required, or it might be specified that certain items be placed under CM. When software products to be developed have the potential to affect public safety, external regulatory bodies may impose constraints. Finally, the particular software life cycle process chosen for a software project and the level of formalism selected to implement the software affect the design and implementation of the SCM process.
Guidance for designing and implementing an SCM process can also be obtained from “best practice,” as reflected in the standards on software engineering issued by the various standards organizations.
Planning for SCM
The planning of an SCM process for a given project should be consistent with the organizational context, applicable constraints, commonly accepted guidance, and the nature of the project (for example, size, safety criticality, and security). The major activities covered are software configuration identification, software configuration control, software configuration status accounting, software configuration auditing, and software release management and delivery. In addition, issues such as organization and responsibilities, resources and schedules, tool selection and implementation, vendor and subcontractor control, and interface control are typically considered. The results of the planning activity are recorded in an SCM Plan (SCMP), which is typically subject to SQA review and audit.
Branching and merging strategies should be carefully planned and communicated, since they impact many SCM activities. From an SCM standpoint, a branch is defined as a set of evolving source file versions [1]. Merging consists in combining different changes to the same file [1]. This typically occurs when more than one person changes a configuration item. There are many branching and merging strategies in common use (see the Further Readings section for additional discussion).
The software development life cycle model (see Software Life Cycle Models in the Software Engineering Process KA) also impacts SCM activities, and SCM planning should take this into account. For instance, continuous integration is a common practice in many software development approaches. It is typically characterized by frequent build-test-deploy cycles. SCM activities must be planned accordingly.
SCM Organization and Responsibilities
To prevent confusion about who will perform given SCM activities or tasks, organizational roles to be involved in the SCM process need to be clearly identified. Specific responsibilities for given SCM activities or tasks also need to be assigned to organizational entities, either by title or by organizational element. The overall authority and reporting channels for SCM should also be identified, although this might be accomplished at the project management or quality assurance planning stage.
SCM Resources and Schedules
Planning for SCM identifies the staff and tools involved in carrying out SCM activities and tasks. It addresses scheduling questions by establishing necessary sequences of SCM tasks and identifying their relationships to the project schedules and milestones established at the project management planning stage. Any training requirements necessary for implementing the plans and training new staff members are also specified.
Tool Selection and Implementation
As for any area of software engineering, the selection and implementation of SCM tools should be carefully planned. The following questions should be considered:
• Organization: what motivates tool acquisition from an organizational perspective?
• Tools: can we use commercial tools or develop them ourselves?
• Environment: what are the constraints imposed by the organization and its technical context?
• Legacy: how will projects use (or not) the new tools?
• Financing: who will pay for the tools’ acquisition, maintenance, training, and customization?
• Scope: how will the new tools be deployed— for instance, through the entire organization or only on specific projects?
• Ownership: who is responsible for the introduction of new tools?
• Future: what is the plan for the tools’ use in the future?
• Change: how adaptable are the tools?
• Branching and merging: are the tools’ capabilities compatible with the planned branching and merging strategies?
• Integration: do the various SCM tools integrate among themselves? With other tools in use in the organization?
• Migration: can the repository maintained by the version control tool be ported to another version control tool while maintaining complete history of the configuration items it contains?
SCM typically requires a set of tools, as opposed to a single tool. Such tool sets are sometimes referred to as workbenches. In such a context, another important consideration in planning for tool selection is determining if the SCM workbench will be open (in other words, tools from different suppliers will be used in different activities of the SCM process) or integrated (where elements of the workbench are designed to work together).
Vendor/Subcontractor Control
A software project might acquire or make use of purchased software products, such as compilers or other tools. SCM planning considers if and how these items will be taken under configuration control (for example, integrated into the project libraries) and how changes or updates will be evaluated and managed.
Similar considerations apply to subcontracted software. When using subcontracted software, both the SCM requirements to be imposed on the subcontractor’s SCM process as part of the subcontract and the means for monitoring compliance need to be established. The latter includes consideration of what SCM information must be available for effective compliance monitoring.
Interface Control
When a software item will interface with another software or hardware item, a change to either item can affect the other. Planning for the SCM process considers how the interfacing items will be identified and how changes to the items will be managed and communicated. The SCM role may be part of a larger, system-level process for interface specification and control; it may involve interface specifications, interface control plans, and interface control documents. In this case, SCM planning for interface control takes place within the context of the systemlevel process.

SCM Plan
The results of SCM planning for a given project are recorded in a software configuration management plan (SCMP), a “living document” which serves as a reference for the SCM process. It is maintained (that is, updated and approved) as necessary during the software life cycle. In implementing the SCMP, it is typically necessary to develop a number of more detailed, subordinate procedures defining how specific requirements will be carried out during day-to-day activities— for example, which branching strategies will be used and how frequently builds occur and automated tests of all kinds are run.
Guidance on the creation and maintenance of an SCMP, based on the information produced by the planning activity, is available from a number of sources, such as [2*]. This reference provides requirements for the information to be contained in an SCMP; it also defines and describes six categories of SCM information to be included in an SCMP:
 • Introduction (purpose, scope, terms used)
• SCM Management (organization, responsibilities, authorities, applicable policies, directives, and procedures)
• SCM Activities (configuration identification, configuration control, and so on)
• SCM Schedules (coordination with other project activities)
• SCM Resources (tools, physical resources, and human resources)
• SCMP Maintenance

Surveillance of Software Configuration Management
After the SCM process has been implemented, some degree of surveillance may be necessary to ensure that the provisions of the SCMP are properly carried out. There are likely to be specific SQA requirements for ensuring compliance with specified SCM processes and procedures. The person responsible for SCM ensures that those with the assigned responsibility perform the defined SCM tasks correctly. The software quality assurance authority, as part of a compliance auditing activity, might also perform this surveillance.
The use of integrated SCM tools with process control capability can make the surveillance task easier. Some tools facilitate process compliance while providing flexibility for the software engineer to adapt procedures. Other tools enforce process, leaving the software engineer with less flexibility. Surveillance requirements and the level of flexibility to be provided to the software engineer are important considerations in tool selection
SCM Measures and Measurement
SCM measures can be designed to provide specific information on the evolving product or to provide insight into the functioning of the SCM process. A related goal of monitoring the SCM process is to discover opportunities for process improvement. Measurements of SCM processes provide a good means for monitoring the effectiveness of SCM activities on an ongoing basis. These measurements are useful in characterizing the current state of the process as well as in providing a basis for making comparisons over time. Analysis of the measurements may produce insights leading to process changes and corresponding updates to the SCMP.
Software libraries and the various SCM tool capabilities provide sources for extracting information about the characteristics of the SCM process (as well as providing project and management information). For example, information about the time required to accomplish various types of changes would be useful in an evaluation of the criteria for determining what levels of authority are optimal for authorizing certain types of changes and for estimating future changes.
 Care must be taken to keep the focus of the surveillance on the insights that can be gained from the measurements, not on the measurements themselves.

In-Process Audits of SCM 
Audits can be carried out during the software engineering process to investigate the current status of specific elements of the configuration or to assess the implementation of the SCM process. In-process auditing of SCM provides a more formal mechanism for monitoring selected aspects of the process and may be coordinated with the SQA function (see topic 5, Software Configuration Auditing).

Back - 0 - Introduction
Next - 2 - Software Configuration Identification
Home - Software Configuration Management
Main - The BOK

Published on : 30-May-2018
Ref no : DTC-WPUB-000043

About Author

My photo
Wan Mohd Adzha CAPM,MCPD,MCSD,MCSE
Passionate about new technology ( Software Engineering ) and how to build,manage and maintain them

Comments