7 - Software Engineering Management - 5 - Review And Evaluation


At prespecified times and as needed, overall progress towards achievement of the stated objectives and satisfaction of stakeholder (user and customer) requirements should be evaluated. Similarly, assessments of the effectiveness of the software process, the personnel involved, and the tools and methods employed should also be undertaken regularly and as determined by circumstances.

Determining Satisfaction of Requirements
Because achieving stakeholder satisfaction is a principal goal of the software engineering manager, progress towards this goal should be assessed periodically. Progress should be assessed on achievement of major project milestones (for example, completion of software design architecture or completion of a software technical review), or upon completion of an iterative development cycle that results in a product increment. Variances from software requirements should be identified and appropriate actions should be taken.
As in the control process activity above (see section 3.5, Control Process), software configuration  control and software configuration management procedures should be followed (see the Software Configuration Management KA), decisions documented and communicated to all relevant parties, plans revisited and revised where necessary, and relevant data recorded (see section 6.3, Perform the Measurement Process).

Reviewing and Evaluating Performance
Periodic performance reviews for project personnel can provide insights as to the likelihood of adherence to plans and processes as well as possible areas of difficulty (for example, team member conflicts). The various methods, tools, and techniques employed should be evaluated for their effectiveness and appropriateness, and the process being used by the project should also be systematically and periodically assessed for relevance, utility, and efficacy in the project context. Where appropriate, changes should be made and managed.

Back - 4 - Software Project Enactment
Next - 6 - Closure
Home - Software Engineering Management
Main - The BOK

Published on : 30-May-2018
Ref no : DTC-WPUB-000056

About Author

My photo
Wan Mohd Adzha CAPM,MCPD,MCSD,MCSE
Passionate about new technology ( Software Engineering ) and how to build,manage and maintain them

Comments