1 - Software Requirements - 7 - Practical Considerations


The first level of topic decomposition presented in this KA may seem to describe a linear sequence of activities. This is a simplified view of the process.

The requirements process spans the whole software life cycle. Change management and the maintenance of the requirements in a state that accurately mirrors the software to be built, or that has been built, are key to the success of the software engineering process.

 Not every organization has a culture of documenting and managing requirements. It is common in dynamic start-up companies, driven by a strong “product vision” and limited resources, to view requirements documentation as unnecessary overhead. Most often, however, as these companies expand, as their customer base grows, and as their product starts to evolve, they discover that they need to recover the requirements that motivated product features in order to assess the impact of proposed changes. Hence, requirements documentation and change management are key to the success of any requirements process.

 Iterative Nature of the Requirements Process
There is general pressure in the software industry for ever shorter development cycles, and this is particularly pronounced in highly competitive, market-driven sectors. Moreover, most projects are constrained in some way by their environment, and many are upgrades to, or revisions of, existing software where the architecture is a given. In practice, therefore, it is almost always impractical to implement the requirements process as a linear, deterministic process in which software requirements are elicited from the stakeholders, baselined, allocated, and handed over to the software development team. It is certainly a myth that the requirements for large software projects are ever perfectly understood or perfectly specified.

 Instead, requirements typically iterate towards a level of quality and detail that is sufficient to permit design and procurement decisions to be made. In some projects, this may result in the requirements being baselined before all their properties are fully understood. This risks expensive rework if problems emerge late in the software engineering process. However, software engineers are necessarily constrained by project management plans and must therefore take steps to ensure that the “quality” of the requirements is as high as possible given the available resources. They should, for example, make explicit any assumptions that underpin the requirements as well as any known problems.

For software products that are developed iteratively, a project team may baseline only those requirements needed for the current iteration. The requirements specialist can continue to develop requirements for future iterations, while developers proceed with design and construction of the current iteration. This approach provides customers with business value quickly, while minimizing the cost of rework.

In almost all cases, requirements understanding continues to evolve as design and development proceeds. This often leads to the revision of requirements late in the life cycle. Perhaps the most crucial point in understanding software requirements is that a significant proportion of the requirements will change. This is sometimes due to errors in the analysis, but it is frequently an inevitable consequence of change in the “environment”—for example, the customer’s operating or business environment, regulatory processes imposed by the authorities, or the market into which software must sell. Whatever the cause, it is important to recognize the inevitability of change and take steps to mitigate its effects. Change has to be managed by ensuring that proposed changes go through a defined review and approval process and by applying careful requirements tracing, impact analysis, and software configuration management (see the Software Configuration Management KA). Hence, the requirements process is not merely a front-end task in software development, but spans the whole software life cycle. In a typical project, the software requirements activities evolve over time from elicitation to change management. A combination of topdown analysis and design methods and bottomup implementation and refactoring methods that meet in the middle could provide the best of both worlds. However, this is difficult to achieve in practice, as it depends heavily upon the maturity and expertise of the software engineers.

Change Management
Change management is central to the management of requirements. This topic describes the role of change management, the procedures that need to be in place, and the analysis that should be applied to proposed changes. It has strong links to the Software Configuration Management KA.

 Requirements Attributes
Requirements should consist not only of a specification of what is required, but also of ancillary information, which helps manage and interpret the requirements. Requirements attributes must be defined, recorded, and updated as the software under development or maintenance evolves. This should include the various classification  dimensions of the requirement (see section 4.1, Requirements Classification) and the verification method or relevant acceptance test plan section. It may also include additional information, such as a summary rationale for each requirement, the source of each requirement, and a change history. The most important requirements attribute, however, is an identifier that allows the requirements to be uniquely and unambiguously identified.

Requirements Tracing
Requirements tracing is concerned with recovering the source of requirements and predicting the effects of requirements. Tracing is fundamental to performing impact analysis when requirements change. A requirement should be traceable backward to the requirements and stakeholders that motivated it (from a software requirement back to the system requirement(s) that it helps satisfy, for example). Conversely, a requirement should be traceable forward into the requirements and design entities that satisfy it (for example, from a system requirement into the software requirements that have been elaborated from it, and on into the code modules that implement it, or the test cases related to that code and even a given section on the user manual which describes the actual functionality) and into the test case that verifies it.

The requirements tracing for a typical project will form a complex directed acyclic graph (DAG) (see Graphs in the Computing Foundations KA) of requirements. Maintaining an up-todate graph or traceability matrix is an activity that must be considered during the whole life cycle of a product. If the traceability information is not updated as changes in the requirements continue to happen, the traceability information becomes unreliable for impact analysis.

Measuring Requirements
As a practical matter, it is typically useful to have some concept of the “volume” of the requirements for a particular software product. This number is useful in evaluating the “size” of a change in requirements, in estimating the cost of a development or maintenance task, or simply for use as the denominator in other measurements. Functional size measurement (FSM) is a technique for evaluating the size of a body of functional requirements.

 Additional information on size measurement and standards will be found in the Software Engineering Process KA.

Back - 6 - Requirements Validation
Next - 8 - Software Requirements Tools
Home - Software Requirement
Main - The BOK

Published on : 30-May-2018
Ref no : DTC-WPUB-000008

About Author

My photo
Wan Mohd Adzha CAPM,MCPD,MCSD,MCSE
Passionate about new technology ( Software Engineering ) and how to build,manage and maintain them

Comments